+84 24 3974 3091

Industry
Financial Services - Finance/Investment - Construction
Skills
 
Creation and desire for learning more in working. 
Enthusiasm: Being willing to tackle challenges and work hard. 
Adaptability: Being able to learn and adapt quickly in different environments. 
Being capable of solving obstacles and problems, having positive attitudes in working and good working relationship with colleagues, being able to work under deadline and high pressure. 
High sense of responsibility 4.1. 
 
Understanding & applying international standards: 
ISO 7919 mechanical vibration evaluation of machine vibration by measurement on rotating shaft. 
ISO 18016 mechanical vibration evaluation of machine vibration by measurement on nonrotating shaft. 
ISO 20816 Mechanical vibration, measurement and evaluation of machine vibration 
Applying American gear manufacturer association ANSI/AGMA 6000-B96 specification for measurement of linear vibration on gear unit. 
ASME PERFORMANCE TES CODE 4 - ASME SECTION II MATERIAL PART A 
ASME B31.3 PROCESS PIPING 4.2. Advanced user of MS Office suite, Auto CAD….
Job Type
Full Time
Languages
English
Summary

10 years working as Mechanical/ Commissioning Engineer Being capable of solving obstacles and problems, having positive attitudes in working relationship with colleagues, being able to work under deadline and high pressure. Working in Nghi Son 1 power plant project: 2x300MW in Nghi Son, Viet Nam and Thai Binh 1 power plant project 2X300MW in Thai Binh, Viet Nam. Working in Nghi Son 1 power plant project: 2x300MW in Nghi Son Viet Nam. Power engineering consulting joint stock company 1 (PECC1) staff Working in Uong Bi Extension 1 power plant project 1x300 MW and Uong Bi extension 2 power plant project 1x330 MW in Uong Bi Viet Nam. Design part: Reviewing boiler’s mechanical system and auxiliary system submitted by EPC Contractor. For example: auxiliary steam system, air- flue gas duct system, coal handling system, pulverized coal system, HFO (heavy fuel oil) supply system, water treatment system… Reviewing the construction statement, ITP (inspection testing plan) for equipment and systems which submitted by Contractor. Erection period: supervising, inspecting for installation boiler’s equipment and auxiliary system as: *Ball mill and auxiliary system *Axial fan, centrifugal fan *Air duct and flue gas duct *Oil burner and oil firing system *Coal burner and coal conduit

What do you need?

    Send to friends


    Share in